Courtesy of Entergy NEWSROOM
By: Mara Hartmann • Sr Lead Communications Specialist
Crews built a tiger dam around the control house at the south Jackson substation to mitigate flooding issues. The substation has been de-entergized.
Due to rising levels on the Pearl River, Entergy Mississippi has de-energized two Jackson substations and disconnected electrical service to some low-lying deer camps in Madison County as a public safety precaution and to comply with the National Electric Safety Code.
Read More: https://www.entergynewsroom.com/article/pearl-river-flooding/
.